Stadium
SNP Arena
About the stadium
construction started 05/2007; opened on January 24, 2009; WIRSOL naming rights 2011-2019; PreZero naming rights 2019-2026; SNP naming rights since July 1, 2026; zero-waste certification since 2023, silver certification in 2024 and 2026; solar installation; floodlights; undersoil heating
Name and capacity history
Name history
- 2026–presentSNP Arena
- 2019–2025PreZero Arena
- 2011–2018WIRSOL Rhein-Neckar-Arena
- 2009–2010Rhein-Neckar-Arena
Stadium facts
| Pitch | 105 x 68 m |
| Surface | Natural grass |
| Owner | TSG 1899 Hoffenheim Fußball-Besitzgesellschaft mbH & Co. KG |
| Operator | TSG 1899 Hoffenheim Fußball-Spielbetriebs GmbH |
